At Tro Realmarks, construction is not just about erecting structures; it’s about creating timeless masterpieces. From residential apartments to commercial complexes and bespoke bungalows, every project reflects our commitment to quality, creativity, and customer satisfaction.
Basic Package – Rs. 1599 / sqft
Excavation:
Excavation in hard rock, Depth upto 6’ from Natural Ground Level.
NOTE : If required, shall be charged additionally if the water table is encountered before 6’ then dewatering charges shall be additional.
Backfilling:
Backfilling in Foundation / 2′ height of Plinth from road level to be done with excavated soil is included. If additional soil / murum is required for backfilling above 2′ Plinth height from road level, the charges will be extra.
Plinth
Plinth Height :
Parking Height
Anti termite-upon Plinth Backfilling
Termite infestation poses a significant threat to residential structures, As a preventive measure during the early stages of construction, anti-termite treatment is applied to the soil during and after plinth backfilling. This process involves treating the soil with chemical solutions that create a barrier to repel or kill termites before they can reach the foundation and structural elements of the home. Conducted before laying flooring or concrete, this treatment is a critical step to ensure the long-term durability and safety of the building.
a) Shuttering-For Slab – M.S Plate, For Beam, Column-Plywood, M.S props will be used
b) Lintels – Shall be provided spanning over the door & window openings
c) Staircase – Regular dog legged staircase with RCC waist slab & RCC steps is considered
d) Chajjas – Basic chajja projections 15″-18″ deep and width equal to the relevant window
Architectural projections shall be charged additionally based on elevation design
Reinforcement
Concrete Grade
Cement
Masonry /Brickwork
Plastering
Waterproofing
Tiles to be fixed with cement mortar (1:4). (Fixing with adhesive and epoxy grout shall be charged additionally).
Floor Tiling
Dado Tiling
Note– Tile without spacer, if spacer required, Grouting will be charged extra
Kitchen
Internal Plumbing
1 Nos Washroom is assumed for 500 sq.ft BUA.
Brand: Johnson or Equivalent
List as below
Main Door
Internal Walls
Putty:
Interior Primer
External walls
External Paint & Primer:
Wires
Switches / Sockets
MCB & DB Electric Conduce Modular Metal Box
Water Tanks : Overhead & Underground Tanks
Silver Package – Rs. 1799 / sqft
Excavation:
Excavation in hard rock, Depth upto 7’ from Natural Ground Level.
NOTE : If required, shall be charged additionally if the water table is encountered before 7’ then dewatering charges shall be additional.
Backfilling:
Backfilling in Foundation / 2′ height of Plinth from road level to be done with excavated soil is included. If additional soil / murum is required for backfilling above 2′ Plinth height from road level, the charges will be extra.
Plinth
Plinth Height :
Parking Height
Anti termite-upon Plinth Backfilling
Termite infestation poses a significant threat to residential structures, As a preventive measure during the early stages of construction, anti-termite treatment is applied to the soil during and after plinth backfilling. This process involves treating the soil with chemical solutions that create a barrier to repel or kill termites before they can reach the foundation and structural elements of the home. Conducted before laying flooring or concrete, this treatment is a critical step to ensure the long-term durability and safety of the building.
a) Shuttering-For Slab – M.S Plate, For Beam, Column-Plywood, M.S props will be used
b) Lintels – Shall be provided spanning over the door & window openings
c) Staircase – Regular dog legged staircase with RCC waist slab & RCC steps is considered
d) Chajjas – Basic chajja projections 15″-18″ deep and width equal to the relevant window
Architectural projections shall be charged additionally based on elevation design
Reinforcement
Concrete Grade
Cement
Masonry /Brickwork
Plastering
Tiles to be fixed with cement mortar (1:4). (Fixing with adhesive and epoxy grout shall be charged additionally).
Floor Tiling
Dado Tiling
Note– Tile without spacer, if spacer required, Grouting will be charged extra
Kitchen
Internal Plumbing
1 Nos Washroom is assumed for 500 sq.ft BUA.
Brand: Parryware or Equivalent
List as below
Main Door
Internal Walls
Putty:
Interior Primer
External walls
External Paint & Primer:
Wires
Switches / Sockets
MCB & DB Electric Conduce Modular Metal Box
Water Tanks : Overhead & Underground Tanks
Gold Package – Rs. 1999 / sqft
Excavation:
Excavation in hard rock, Depth upto 7’ from Natural Ground Level.
NOTE : If required, shall be charged additionally if the water table is encountered before 7’ then dewatering charges shall be additional.
Backfilling:
Backfilling in Foundation / 3′ height of Plinth from road level to be done with excavated soil is included. If additional soil / murum is required for backfilling above 3′ Plinth height from road level, the charges will be extra.
Plinth
Plinth Height :
Parking Height
Anti termite-upon Plinth Backfilling
Termite infestation poses a significant threat to residential structures, As a preventive measure during the early stages of construction, anti-termite treatment is applied to the soil during and after plinth backfilling. This process involves treating the soil with chemical solutions that create a barrier to repel or kill termites before they can reach the foundation and structural elements of the home. Conducted before laying flooring or concrete, this treatment is a critical step to ensure the long-term durability and safety of the building.
a) Shuttering-For Slab – M.S Plate, For Beam, Column-Plywood, M.S props will be used
b) Lintels – Shall be provided spanning over the door & window openings
c) Staircase – Regular dog legged staircase with RCC waist slab & RCC steps is considered
d) Chajjas – Basic chajja projections 15″-18″ deep and width equal to the relevant window
Architectural projections shall be charged additionally based on elevation design
Reinforcement
Concrete Grade
Cement
Masonry /Brickwork
Plastering
Waterproofing
Tiles to be fixed with cement mortar (1:4). (Fixing with adhesive and epoxy grout shall be charged additionally).
Floor Tiling
Dado Tiling
Note– Tile without spacer, if spacer required, Grouting will be charged extra
Kitchen
Internal Plumbing
1 Nos Washroom is assumed for 500 sq.ft BUA.
Brand: Jaguar Premium Series or Equivalent
List as below
Main Door
Internal Walls
Putty:
Interior Primer
External walls
External Paint & Primer:
Wires
Switches / Sockets
MCB & DB Electric Conduce Modular Metal Box
Water Tanks : Overhead & Underground Tanks
Platinum Package – Rs. 2299 / sqft
Excavation:
Excavation in hard rock, Depth upto 7’ from Natural Ground Level.
NOTE : If required, shall be charged additionally if the water table is encountered before 7’ then dewatering charges shall be additional.
Backfilling:
Backfilling in Foundation / 3′ height of Plinth from road level to be done with excavated soil is included. If additional soil / murum is required for backfilling above 3′ Plinth height from road level, the charges will be extra.
Plinth
Plinth Height :
Parking Height
Anti termite-upon Plinth Backfilling
Termite infestation poses a significant threat to residential structures, As a preventive measure during the early stages of construction, anti-termite treatment is applied to the soil during and after plinth backfilling. This process involves treating the soil with chemical solutions that create a barrier to repel or kill termites before they can reach the foundation and structural elements of the home. Conducted before laying flooring or concrete, this treatment is a critical step to ensure the long-term durability and safety of the building.
a) Shuttering-For Slab – M.S Plate, For Beam, Column-Plywood, M.S props will be used
b) Lintels – Shall be provided spanning over the door & window openings
c) Staircase – Regular dog legged staircase with RCC waist slab & RCC steps is considered
d) Chajjas – Basic chajja projections 15″-18″ deep and width equal to the relevant window
Architectural projections shall be charged additionally based on elevation design
Reinforcement
Concrete Grade
Cement
Masonry /Brickwork
Plastering
Waterproofing
Tiles to be fixed with cement mortar (1:4). (Fixing with adhesive and epoxy grout shall be charged additionally).
Floor Tiling
Dado Tiling
Note– Tile without spacer, if spacer required, Grouting will be charged extra
Kitchen
Internal Plumbing
1 Nos Washroom is assumed for 500 sq.ft BUA.
Brand: Kohler Premium Series or Equivalent
List as below
Main Door
Internal Walls
Putty:
Interior Primer
External walls
External Paint & Primer:
Wires
Switches / Sockets
MCB & DB Electric Conduce Modular Metal Box
Water Tanks : Overhead & Underground Tanks
Basic Package – Rs. 1599 / sqft
Excavation:
Excavation in hard rock, Depth upto 5’ from Natural Ground Level.
NOTE : If required, shall be charged additionally if the water table is encountered before 5’ then dewatering charges shall be additional.
Backfilling:
Backfilling in Foundation / 2′ height of Plinth from road level to be done with excavated soil is included. If additional soil / murum is required for backfilling above 2′ Plinth height from road level, the charges will be extra.
Plinth
Plinth Height :
Parking Height
Anti termite-upon Plinth Backfilling
Termite infestation poses a significant threat to residential structures, As a preventive measure during the early stages of construction, anti-termite treatment is applied to the soil during and after plinth backfilling. This process involves treating the soil with chemical solutions that create a barrier to repel or kill termites before they can reach the foundation and structural elements of the home. Conducted before laying flooring or concrete, this treatment is a critical step to ensure the long-term durability and safety of the building.
a) Shuttering-For Slab – M.S Plate, For Beam, Column-Plywood, M.S props will be used
b) Lintels – Shall be provided spanning over the door & window openings
c) Staircase – Regular dog legged staircase with RCC waist slab & RCC steps is considered
d) Chajjas – Basic chajja projections 15″-18″ deep and width equal to the relevant window
Architectural projections shall be charged additionally based on elevation design
Reinforcement
Concrete Grade
Cement
Masonry /Brickwork
Plastering
Waterproofing
Tiles to be fixed with cement mortar (1:4). (Fixing with adhesive and epoxy grout shall be charged additionally).
Floor Tiling
Dado Tiling
Note– Tile without spacer, if spacer required, Grouting will be charged extra
Kitchen
Internal Plumbing
1 Nos Washroom is assumed for 500 sq.ft BUA.
Brand: Johnson or Equivalent
List as below
Main Door
Internal Walls
Putty:
Interior Primer
External walls
External Paint & Primer:
Wires
Switches / Sockets
MCB & DB Electric Conduce Modular Metal Box
Water Tanks : Overhead & Underground Tanks
Silver Package -Rs. 1799 / sqft
Excavation:
Excavation in hard rock, Depth upto 5’ from Natural Ground Level.
NOTE : If required, shall be charged additionally if the water table is encountered before 5’ then dewatering charges shall be additional.
Backfilling:
Backfilling in Foundation / 2′ height of Plinth from road level to be done with excavated soil is included. If additional soil / murum is required for backfilling above 2′ Plinth height from road level, the charges will be extra.
Plinth
Plinth Height :
Parking Height
Anti termite-upon Plinth Backfilling
Termite infestation poses a significant threat to residential structures, As a preventive measure during the early stages of construction, anti-termite treatment is applied to the soil during and after plinth backfilling. This process involves treating the soil with chemical solutions that create a barrier to repel or kill termites before they can reach the foundation and structural elements of the home. Conducted before laying flooring or concrete, this treatment is a critical step to ensure the long-term durability and safety of the building.
a) Shuttering-For Slab – M.S Plate, For Beam, Column-Plywood, M.S props will be used
b) Lintels – Shall be provided spanning over the door & window openings
c) Staircase – Regular dog legged staircase with RCC waist slab & RCC steps is considered
d) Chajjas – Basic chajja projections 15″-18″ deep and width equal to the relevant window
Architectural projections shall be charged additionally based on elevation design
Reinforcement
Concrete Grade
Cement
Masonry /Brickwork
Plastering
Waterproofing
Tiles to be fixed with cement mortar (1:4). (Fixing with adhesive and epoxy grout shall be charged additionally).
Floor Tiling
Dado Tiling
Note– Tile without spacer, if spacer required, Grouting will be charged extra
Kitchen
Internal Plumbing
1 Nos Washroom is assumed for 500 sq.ft BUA.
Brand: Parryware or Equivalent
List as below
Main Door
Internal Walls
Putty:
Interior Primer
External walls
External Paint & Primer:
Wires
Switches / Sockets
MCB & DB Electric Conduce Modular Metal Box
Water Tanks : Overhead & Underground Tanks
Gold Package -Rs. 1999 / sqft
Excavation:
Excavation in hard rock, Depth upto 7’ from Natural Ground Level.
NOTE : If required, shall be charged additionally if the water table is encountered before 7’ then dewatering charges shall be additional.
Backfilling:
Backfilling in Foundation / 3′ height of Plinth from road level to be done with excavated soil is included. If additional soil / murum is required for backfilling above 3′ Plinth height from road level, the charges will be extra.
Plinth
Plinth Height :
Parking Height
Anti termite-upon Plinth Backfilling
Termite infestation poses a significant threat to residential structures, As a preventive measure during the early stages of construction, anti-termite treatment is applied to the soil during and after plinth backfilling. This process involves treating the soil with chemical solutions that create a barrier to repel or kill termites before they can reach the foundation and structural elements of the home. Conducted before laying flooring or concrete, this treatment is a critical step to ensure the long-term durability and safety of the building.
a) Shuttering-For Slab – M.S Plate, For Beam, Column-Plywood, M.S props will be used
b) Lintels – Shall be provided spanning over the door & window openings
c) Staircase – Regular dog legged staircase with RCC waist slab & RCC steps is considered
d) Chajjas – Basic chajja projections 15″-18″ deep and width equal to the relevant window
Architectural projections shall be charged additionally based on elevation design
Reinforcement
Concrete Grade
Cement
Masonry /Brickwork
Plastering
Waterproofing
Tiles to be fixed with cement mortar (1:4). (Fixing with adhesive and epoxy grout shall be charged additionally).
Floor Tiling
Dado Tiling
Note– Tile without spacer, if spacer required, Grouting will be charged extra
Kitchen
Internal Plumbing
1 Nos Washroom is assumed for 500 sq.ft BUA.
Brand: Jaguar Premium Series or Equivalent
List as below
Main Door
Internal Walls
Putty:
Interior Primer
External walls
External Paint & Primer:
Wires
Switches / Sockets
MCB & DB Electric Conduce Modular Metal Box
Water Tanks : Overhead & Underground Tanks
Platinum Package -Rs. 2299 / sqft
Excavation:
Excavation in hard rock, Depth upto 7’ from Natural Ground Level.
NOTE : If required, shall be charged additionally if the water table is encountered before 7’ then dewatering charges shall be additional.
Backfilling:
Backfilling in Foundation / 3′ height of Plinth from road level to be done with excavated soil is included. If additional soil / murum is required for backfilling above 3′ Plinth height from road level, the charges will be extra.
Plinth
Plinth Height :
Parking Height
Anti termite-upon Plinth Backfilling
Termite infestation poses a significant threat to residential structures, As a preventive measure during the early stages of construction, anti-termite treatment is applied to the soil during and after plinth backfilling. This process involves treating the soil with chemical solutions that create a barrier to repel or kill termites before they can reach the foundation and structural elements of the home. Conducted before laying flooring or concrete, this treatment is a critical step to ensure the long-term durability and safety of the building.
a) Shuttering-For Slab – M.S Plate, For Beam, Column-Plywood, M.S props will be used
b) Lintels – Shall be provided spanning over the door & window openings
c) Staircase – Regular dog legged staircase with RCC waist slab & RCC steps is considered
d) Chajjas – Basic chajja projections 15″-18″ deep and width equal to the relevant window
Architectural projections shall be charged additionally based on elevation design
Reinforcement
Concrete Grade
Cement
Masonry /Brickwork
Plastering
Waterproofing
Tiles to be fixed with cement mortar (1:4). (Fixing with adhesive and epoxy grout shall be charged additionally).
Floor Tiling
Dado Tiling
Note– Tile without spacer, if spacer required, Grouting will be charged extra
Kitchen
Internal Plumbing
1 Nos Washroom is assumed for 500 sq.ft BUA.
Brand: Jaguar Premium Series or Equivalent
List as below
Main Door
Internal Walls
Putty:
Interior Primer
External walls
External Paint & Primer:
Wires
Switches / Sockets
MCB & DB Electric Conduce Modular Metal Box
Water Tanks : Overhead & Underground Tanks
Basic Package -Rs. 1499 / sqft
Excavation:
Excavation in hard rock, Depth upto 6’ from Natural Ground Level.
NOTE : If required, shall be charged additionally if the water table is encountered before 6’ then dewatering charges shall be additional.
Backfilling:
Backfilling in Foundation / 2′ height of Plinth from road level to be done with excavated soil is included. If additional soil / murum is required for backfilling above 2′ Plinth height from road level, the charges will be extra.
Plinth
Plinth Height :
Parking Height
Anti termite-upon Plinth Backfilling
Termite infestation poses a significant threat to residential structures, As a preventive measure during the early stages of construction, anti-termite treatment is applied to the soil during and after plinth backfilling. This process involves treating the soil with chemical solutions that create a barrier to repel or kill termites before they can reach the foundation and structural elements of the home. Conducted before laying flooring or concrete, this treatment is a critical step to ensure the long-term durability and safety of the building.
a) Shuttering-For Slab – M.S Plate, For Beam, Column-Plywood, M.S props will be used
b) Lintels – Shall be provided spanning over the door & window openings
c) Staircase – Regular dog legged staircase with RCC waist slab & RCC steps is considered
d) Chajjas – Basic chajja projections 15″-18″ deep and width equal to the relevant window
Architectural projections shall be charged additionally based on elevation design
Reinforcement
Concrete Grade
Cement
Masonry /Brickwork
Plastering
Waterproofing
Tiles to be fixed with cement mortar (1:4). (Fixing with adhesive and epoxy grout shall be charged additionally).
Floor Tiling
Dado Tiling
Note– Tile without spacer, if spacer required, Grouting will be charged extra
Kitchen
Internal Plumbing
1 Nos Washroom is assumed for 500 sq.ft BUA.
Brand: Johnson or Equivalent
List as below
Main Door
Internal Walls
Putty:
Interior Primer
External walls
External Paint & Primer:
Wires
Switches / Sockets
MCB & DB Electric Conduce Modular Metal Box
Water Tanks : Overhead & Underground Tanks
Silver Package – Rs. 1799 / sqft
Excavation:
Excavation in hard rock, Depth upto 7’ from Natural Ground Level.
NOTE : If required, shall be charged additionally if the water table is encountered before 7’ then dewatering charges shall be additional.
Backfilling:
Backfilling in Foundation / 2′ height of Plinth from road level to be done with excavated soil is included. If additional soil / murum is required for backfilling above 2′ Plinth height from road level, the charges will be extra.
Plinth
Plinth Height :
Parking Height
Anti termite-upon Plinth Backfilling
Termite infestation poses a significant threat to residential structures, As a preventive measure during the early stages of construction, anti-termite treatment is applied to the soil during and after plinth backfilling. This process involves treating the soil with chemical solutions that create a barrier to repel or kill termites before they can reach the foundation and structural elements of the home. Conducted before laying flooring or concrete, this treatment is a critical step to ensure the long-term durability and safety of the building.
a) Shuttering-For Slab – M.S Plate, For Beam, Column-Plywood, M.S props will be used
b) Lintels – Shall be provided spanning over the door & window openings
c) Staircase – Regular dog legged staircase with RCC waist slab & RCC steps is considered
d) Chajjas – Basic chajja projections 15″-18″ deep and width equal to the relevant window
Architectural projections shall be charged additionally based on elevation design
Reinforcement
Concrete Grade
Cement
Masonry /Brickwork
Plastering
Waterproofing
Tiles to be fixed with cement mortar (1:4). (Fixing with adhesive and epoxy grout shall be charged additionally).
Floor Tiling
Dado Tiling
Note– Tile without spacer, if spacer required, Grouting will be charged extra
Kitchen
Internal Plumbing
1 Nos Washroom is assumed for 500 sq.ft BUA.
Brand: Parryware or Equivalent
List as below
Main Door
Internal Walls
Putty:
Interior Primer
External walls
External Paint & Primer:
Wires
Switches / Sockets
MCB & DB Electric Conduce Modular Metal Box
Water Tanks : Overhead & Underground Tanks
Gold Package – Rs. 1999 / sqft
Excavation:
Excavation in hard rock, Depth upto 7’ from Natural Ground Level.
NOTE : If required, shall be charged additionally if the water table is encountered before 7’ then dewatering charges shall be additional.
Backfilling:
Backfilling in Foundation / 3′ height of Plinth from road level to be done with excavated soil is included. If additional soil / murum is required for backfilling above 3′ Plinth height from road level, the charges will be extra.
Plinth
Plinth Height :
Parking Height
Anti termite-upon Plinth Backfilling
Termite infestation poses a significant threat to residential structures, As a preventive measure during the early stages of construction, anti-termite treatment is applied to the soil during and after plinth backfilling. This process involves treating the soil with chemical solutions that create a barrier to repel or kill termites before they can reach the foundation and structural elements of the home. Conducted before laying flooring or concrete, this treatment is a critical step to ensure the long-term durability and safety of the building.
a) Shuttering-For Slab – M.S Plate, For Beam, Column-Plywood, M.S props will be used
b) Lintels – Shall be provided spanning over the door & window openings
c) Staircase – Regular dog legged staircase with RCC waist slab & RCC steps is considered
d) Chajjas – Basic chajja projections 15″-18″ deep and width equal to the relevant window
Architectural projections shall be charged additionally based on elevation design
Reinforcement
Concrete Grade
Cement
Masonry /Brickwork
Plastering
Waterproofing
Tiles to be fixed with cement mortar (1:4). (Fixing with adhesive and epoxy grout shall be charged additionally).
Floor Tiling
Dado Tiling
Note– Tile without spacer, if spacer required, Grouting will be charged extra
Kitchen
Internal Plumbing
1 Nos Washroom is assumed for 500 sq.ft BUA.
Brand: Jaguar Premium Series or Equivalent
List as below
Main Door
Internal Walls
Putty:
Interior Primer
External walls
External Paint & Primer:
Wires
Switches / Sockets
MCB & DB Electric Conduce Modular Metal Box
Water Tanks : Overhead & Underground Tanks
Platinum Package – Rs. 2299 / sqft
Excavation:
Excavation in hard rock, Depth upto 7’ from Natural Ground Level.
NOTE : If required, shall be charged additionally if the water table is encountered before 7’ then dewatering charges shall be additional.
Backfilling:
Backfilling in Foundation / 3′ height of Plinth from road level to be done with excavated soil is included. If additional soil / murum is required for backfilling above 3′ Plinth height from road level, the charges will be extra.
Plinth
Plinth Height :
Parking Height
Anti termite-upon Plinth Backfilling
Termite infestation poses a significant threat to residential structures, As a preventive measure during the early stages of construction, anti-termite treatment is applied to the soil during and after plinth backfilling. This process involves treating the soil with chemical solutions that create a barrier to repel or kill termites before they can reach the foundation and structural elements of the home. Conducted before laying flooring or concrete, this treatment is a critical step to ensure the long-term durability and safety of the building.
a) Shuttering-For Slab – M.S Plate, For Beam, Column-Plywood, M.S props will be used
b) Lintels – Shall be provided spanning over the door & window openings
c) Staircase – Regular dog legged staircase with RCC waist slab & RCC steps is considered
d) Chajjas – Basic chajja projections 15″-18″ deep and width equal to the relevant window
Architectural projections shall be charged additionally based on elevation design
Reinforcement
Concrete Grade
Cement
Masonry /Brickwork
Plastering
Waterproofing
Tiles to be fixed with cement mortar (1:4). (Fixing with adhesive and epoxy grout shall be charged additionally).
Floor Tiling
Dado Tiling
Note– Tile without spacer, if spacer required, Grouting will be charged extra
Kitchen
Internal Plumbing
1 Nos Washroom is assumed for 500 sq.ft BUA.
Brand: Kohler Premium Series or Equivalent
List as below
Main Door
Internal Walls
Putty:
Interior Primer
External walls
External Paint & Primer:
Wires
Switches / Sockets
MCB & DB Electric Conduce Modular Metal Box
Water Tanks : Overhead & Underground Tanks